Case
Study 2 - Front
End Design
A new multi-product
therapeutic protein contract manufacturing facility incorporating two
production suites. The main project objective was to independently
validate the design, and to demonstrate the flexibility of the facility
to the client, including the capability to manufacture a wide range
of different therapeutic protein products (over 80% of those on the
market and in development).
|
Aims & Objectives
- Design
validation
- Risk
reduction
- Future
proofing
- Independent
analysis
- Capacity
prediction
|
|
Results
- Schedule
clash = WFI shortage! This is avoidable through careful plainning
- CIP
system over-sized - process uses only 20% of process and 5%
of support skid capacity
- Decontamination
system usage < 50%
- Neutralisation
system utilisation >400% caused
by concurrent demand from both purification suite
|
< |